National Consultant to Train and Support 20 Public Buildings and 10 Education Establishments to Phase out SUP by 2030
- Deliverable 1: Inception Report
- This deliverable establishes the methodology, timeline, and tools for engaging the 30 targeted institutions. It sets the foundation for a coordinated rollout of training and site assessment activities. The national consultant will:
- Review the Output 2.2.1 guideline and training manual to confirm alignment with training content and adapt materials where necessary for government and education audiences.
- Map the 20 public buildings and 10 education establishments, confirm institutional focal points, and establish a coordination mechanism with MOE for rollout.
- Identify and assess the educational materials, SUP-related communication needs, and printing requirements of targeted institutions to inform outreach preparation.
- Develop a site assessment questionnaire and checklist to evaluate existing infrastructure, operational readiness, and suitability for water dispenser installations.
- Draft a detailed work plan and training schedule covering targeted institutions across Phnom Penh, Siem Reap, and Preah Sihanouk.
- Submit the inception report to MOE and PMU for review and approval before proceeding to subsequent deliverables.
- Deliverable 2: Site Assessment and Final Evaluation Report
- This deliverable consolidates infrastructure assessment findings and overall training impact into a single final report. It provides the evidence base for procurement and installation decisions and captures lessons learned to inform future scale-up. The national consultant will:
- Conduct site assessments at all 30 targeted institutions using the questionnaire and checklist developed under Deliverable 1, evaluating infrastructure conditions, water access, and readiness for water dispenser installations.
- Facilitate a closing working group meeting with targeted ministries to present assessment findings, surface opportunities and constraints, and agree on recommended next steps.
- Revise the training manual to reflect feedback, gaps, and limitations observed during training delivery, and submit the updated version to MOE.
- Produce a consolidated site assessment and final evaluation report, including installation recommendations by institution, training impact findings, and proposed follow-up actions for MOE consideration.
- Deliverable 3 and 4: Lead and Provide 2 Days of Capacity Building Trainings
- This deliverable documents the delivery of training sessions and outreach activities to targeted institutions, demonstrating how participating organizations are equipped to apply the SUP phase-out guideline in their operations. The national consultant will:
- Facilitate a preparatory working group meeting with focal points from targeted ministries and education establishments to align on training objectives, logistics, and institutional roles.
- Deliver 2 days of capacity building training using the Output 2.2.1 training manual, adapting content and facilitation approaches to the needs and contexts of government and education participants.
- Distribute and contextualize educational materials, SUP awareness tools, and printed outreach resources tailored to each institution type.
- Administer pre- and post-training evaluations to assess shifts in participants' knowledge and understanding of SUP phase-out practices and circular alternatives.
- Compile and submit a training report to MOE summarizing delivery, participation, outreach reach, and key observations from the sessions.
联系方式
- 👤 联系人:Promoting Circular Solutions for Food and Beverage Sector to Tackle Plastic Pollution in Cambodia
- 📞 电话:099 644 386
- ✉️ 邮箱:plasticrebootcambodia.org@gmail.com
- 📍 地址:Sangkat Tonle Basak, Khan Chamkar Mon, Phnom Penh, Cambodia
位置 / Google 地图
来源:网络 · 2026-08-19 08:31:26