National Consultant to Conduct an ESIA and Prepare the ESSP and ESMP for the Rehabilitation of 11 Community ponds and 6 CBO Tree Nurseries
- Prepare an Inception Report
- Prepare an inception report outlining the background, objectives, scope of work, methodology, work plan, and expected deliverables for the assignment.
- Define the approach and procedures for conducting the ESIA and preparing the ESSP and ESMP.
- Establish a detailed work plan, including key activities, timelines, coordination arrangements, responsibilities, and deliverables, in consultation with the project team and the International CTA.
- Conduct the ESIA and Prepare the ESSP and ESMP
- Conduct an ESIA and prepare the ESSP and ESMP for the rehabilitation of 11 community ponds and 6 CBO tree nurseries across the six target districts: Soutr Nikom, Svay Leu, Banteay Srei, Run Ta Ek Techo Sen City, Angkor Thom, and Varin.
- Assess potential environmental and social impacts and risks associated with the proposed rehabilitation activities, including impacts on natural habitats, climate change, pollution, waste management, community health and safety, livelihoods, gender equality, vulnerable groups, human rights, Indigenous Peoples, persons with disabilities, physical and economic displacement, and cultural heritage.
- Review applicable national laws, policies, regulations, institutional arrangements, UNDP Social and Environmental Standards (SES), and other relevant international requirements, and identify any gaps between national requirements and applicable international standards.
- Conduct consultations with relevant district and provincial authorities, local communities, and other stakeholders to identify environmental and social concerns, validate assessment findings, and inform the preparation of the ESSP and ESMP.
- Review and update the Social and Environmental Screening Procedure (SESP), as applicable, and assess and categorize environmental and social risks at the community and site levels in accordance with applicable project requirements and UNDP SES.
- Prepare an environmental and social risk register and identify appropriate mitigation measures, including measures to address risks related to stakeholder engagement, the Free, Prior and Informed Consent (FPIC) process where applicable, and the Grievance Redress Mechanism (GRM).
- Develop practical, site-specific ESMPs based on the ESIA findings, the ESSP, and relevant project documents and plans, including the Gender Action Plan.
- Define appropriate mitigation measures, environmental and social monitoring indicators, reporting requirements, implementation responsibilities, timelines, estimated costs, and capacity-building needs, Include additional management plans, where applicable, such as a Waste Management Plan, Pesticide and Chemicals Management Plan, and Cultural Heritage Management Plan.
- In addition, the national consultant needs to be prepared the ESSP on Biodiversity Conservation and Sustainable Natural Resource Management Climate Change and Disaster Risks Community Health, Safety and Security Cultural Heritage Displacement and Resettlement Indigenous Peoples, Labor and Working Conditions Pollution Prevention, accountably, gender, human rights, displacement,
- Ensure that the ESMP measures are integrated into project implementation, monitoring, and reporting system, includes Gender Action Plan and Stakeholder Engagement.
- Facilitate the FPIC process in collaboration with the project team and relevant stakeholders where required by applicable standards and circumstances.
- Coordinate with the project's Gender and Safeguards Officer to ensure that gender considerations, the needs of vulnerable groups, stakeholder engagement, and grievance-handling procedures are adequately addressed throughout the assessment and planning process.
- Submit the Final Reports
- Revise and finalize the ESIA, ESSP, and ESMP by incorporating comments and feedback received from the project team, relevant authorities, and other stakeholders, these include anticipate and avoid, minimize and reduce, mitigate risks.
- Submit the final ESIA, ESSP, and ESMP reports, together with supporting documentation, in accordance with the agreed work plan and reporting requirements.
- Attach records of stakeholder consultations to the final reports, including consultation summaries, participant lists with signatures, and photographs, subject to informed consent and applicable privacy requirements.
- Where FPIC is applicable, document the process and provide the relevant consent records and supporting evidence in accordance with applicable standards.
- Work closely with the project's Gender and Safeguards Officer to establish or strengthen the GRM, ensure that affected communities are informed of the available grievance channels, and document the GRM arrangements in the relevant reports and management plans.
- Present the final findings, recommendations, and proposed mitigation measures to the project team and relevant stakeholders, as required.
联系方式
- 👤 联系人:MoE-LDCF Project
- 📞 电话:061 677 766
- ✉️ 邮箱:MoE.LDCF.Project@gmail.com
- 📍 地址:Morodok Techo Building (Lot 503), Sangkat Tonle Basak, Khan Chamkar Mon, Phnom Penh, Cambodia
位置 / Google 地图
来源:网络 · 2026-10-30 20:15:57